Early Production Stage
Jahar Gas Field and Plant is located near the city of Palmyra in the Syrian desert. It is considered a joint investment between the Syrian Gas Company and the Croatian company Ena. The production capacity of the field exceeds four million cubic meters per day of compressed natural gas (CNG) . The plant was rehabilitated after being destroyed during the war in its area.
Our company has contracted the early start-up part of the main sections , Which allows to dry the gas and send it ready to invest through the pipelines of the Syrian gas network.
The project consists mainly of a central control panel that controls two sections of the plant:
the Burner and BEDs. In addition to its subsidiary sub-sections such as insulation tanks, wells outlets and alarm signals.
- The Burner that is used to heat mineral oil for gas processing
- BEDs for drying the gas in a very precise chronological sequence divided into six stages during the day.
- In addition to its sub-sections such as insulation tanks, exit wells with alarm signals, status and others.
Equipment and software used:
PLC manufactured by Hitachi, Japan, with advanced technology and high processing capabilities up to the level of DCS systems, Connected to a computer to work with Movicon SCADA from Progea Europe.
Statistics on the project
Item | DESCRIPTION | Qty. |
Controller CPU | HITACHI PAC HX-CP1H16 Full Function | 1+1 |
Analog Input | 17 Modules x 8 Channels | 136 |
Analog Output | 03 Modules x 8 Channels | 24 |
Digital Input | 04 Modules x 64 Channels | 256 |
Digital Output | 03 Modules x 64 Channels | 192 |
PLC Programming | CODESYS | 1 |
PLC Program | 1504 Variables 40 Function Block333 Main Ladder Lines | |
SCADA Program | Movicon | 1 |
SCADA Screens | 20 Main + 8 Settings + 62 Pop-up | 90 |
SCADA Tags | 2473 Active Variables | 2473 |
Programming Hours | 560 Hours | 560 |